Duitse hoogspanningsmasten
Re: Duitse hoogspanningsmasten
Sign on Tower 52 of Facility 617
- Bijlagen
-
- Mastschild_Anlage617_Mast52_24052021.png (1.22 MiB) 5201 keer geschouwd
Re: Duitse hoogspanningsmasten
Further eastward one find this transposition tower in this line, which carries the number 57. Originally it had three crossbars, whereby the lowest, now dismantled crossbar was once used by a medium-voltage line, which crossed this line in an obtrused angle.
- Bijlagen
-
- Anlage617_Mast57_24052021.png (1.06 MiB) 5200 keer geschouwd
Re: Duitse hoogspanningsmasten
Sign on Tower 57 of Facility 617
- Bijlagen
-
- Mastschild_Anlage617_Mast57_24052021.png (1.39 MiB) 5199 keer geschouwd
Re: Duitse hoogspanningsmasten
Tower 511 of Facility 617, a branch pylon of powerline Oberjettingen-Tübingen. The branching powerline runs to Rottenburg substation. The next pylon of this line in direction Tübingen is Tower 52, which carries a cellphone transmission site and is shown in this thread a few pictures before.
- Bijlagen
-
- Anlage617_Mast511_29052021_1.png (1.18 MiB) 4402 keer geschouwd
Re: Duitse hoogspanningsmasten
Two further pictures of this tower
- Bijlagen
-
- Anlage617_Mast511_29052021_2.png (1.09 MiB) 4403 keer geschouwd
-
- Anlage617_Mast511_29052021_3.png (1.11 MiB) 4403 keer geschouwd
Re: Duitse hoogspanningsmasten
The sign on this branch pylon
- Bijlagen
-
- Mastschild_Anlage617_Mast511_29052021.png (982.51 KiB) 4402 keer geschouwd
Re: Duitse hoogspanningsmasten
Tower 13 of Facility 343 (380 kV/110 kV-powerline Wendlingen-Metzingen), a pylon with a cellphone transmitter west of Nürtingen-Reudern
- Bijlagen
-
- Anlage343_Mast13_03062021_1.png (1.11 MiB) 4310 keer geschouwd
-
- Anlage343_Mast13_03062021_2.png (1021.08 KiB) 4310 keer geschouwd
-
- Anlage343_Mast13_03062021_3.png (1.12 MiB) 4310 keer geschouwd
-
- Mastschild_Anlage343_Mast13_03062021.png (1.03 MiB) 4310 keer geschouwd
Re: Duitse hoogspanningsmasten
At present the double-circuit 110 kV-line Hattenhofen-Kirchheim/Teck is replaced by a line, whose towers are also capable to carry two 110 kV single-phase-AC circuits for the power supply of the new railway line Stuttgart-Ulm, which is still under construction. West of Hattenhofen, where this picture was taken, construction work is still under way.
- Bijlagen
-
- Hochspannungsleitungen_westlich_Hattenhofen03062021.png (1.78 MiB) 4310 keer geschouwd
Re: Duitse hoogspanningsmasten
A strainer of the new line Hattenhofen-Kirchheim/Teck still under construction. In the background pylons carrying the 110 kV single-phase AC line Plochingen-Amstetten of the German Railway Company and the 110 kV-line Hattenhofen-Eislingen
- Bijlagen
-
- Hochspannungsleitungen_nordwestlich_Hattenhofen03062021.png (1.44 MiB) 4310 keer geschouwd
Re: Duitse hoogspanningsmasten
In Hattenhofen a temporary electricity pylon was erected. Right of it stood the old pylon of the 110 kV-line Kirchheim/Teck-Hattenhofen. For its replacement, it is also necessary to replace its basement, as the new tower will carry 10 conductors, while the old tower had just 6 conductors.
- Bijlagen
-
- Behelfsmast_Hattenhofen03062021.png (1.11 MiB) 4310 keer geschouwd