Enorme problemen in o.a. de franse kerncentrales
Enorme problemen in o.a. de franse kerncentrales
Gerommel en fraude met certificaten van kritieke onderdelen, toezichthouder legt centrales stil:
Re: Enorme problemen in o.a. de franse kerncentrales
Dit lijkt een artikel uit 2016...?
Re: Enorme problemen in o.a. de franse kerncentrales
Ja, het is ook al lang beschreven in Wikipedia:
In 2016, following a discovery at Flamanville Nuclear Power Plant, about 400 large steel forgings manufactured by Le Creusot Forge since 1965 were found to have carbon-content irregularities that weakened the steel. A widespread programme of reactor checks was started involving a progressive programme of reactor shutdowns, continued over the winter high electricity demand period into 2017. This caused power price increases in Europe as France increased electricity imports, especially from Germany, to augment supply.[30][31] As of late October 2016, 20 of France's 58 reactors were offline.[32][33] These steel quality concerns may prevent the regulator giving the life extensions from 40 to 50 years, that had been assumed by energy planners, for many reactors.[34] In December 2016 the Wall Street Journal characterised the problem as a "decades long coverup of manufacturing problems", with Areva executives acknowledging that Le Creusot had been falsifying documents.[35] The Le Creusot forge was out of operation from December 2015 to January 2018 while improvements to process controls, the quality management system, organisation and safety culture were made.[36]
Re: Enorme problemen in o.a. de franse kerncentrales
Nou idd zeg... Kwam vandaag op twitter langs, nou ja, vond het al vreemd dat er niets over in het nieuws te horen was. Intussen zal het dus wel opgelost zijn
Re: Enorme problemen in o.a. de franse kerncentrales
Zal wel iemand zijn met een agenda tegen kernenergie.